•   Pheo-Care-Dog-Training-LeashLong-Lead-with-Padded-Foam-Handle-Metal-HookThreads-Tracking-Check-Leashes-for-Small-Medium-Large-Heavy-Duty-DogsCampingAgility-TrainingWalkingPlay-Orange-16FT
  •   Pheo-Care-Dog-Training-LeashLong-Lead-with-Padded-Foam-Handle-Metal-HookThreads-Tracking-Check-Leashes-for-Small-Medium-Large-Heavy-Duty-DogsCampingAgility-TrainingWalkingPlay-Orange-16FT
  •   Pheo-Care-Dog-Training-LeashLong-Lead-with-Padded-Foam-Handle-Metal-HookThreads-Tracking-Check-Leashes-for-Small-Medium-Large-Heavy-Duty-DogsCampingAgility-TrainingWalkingPlay-Orange-16FT
  •   Pheo-Care-Dog-Training-LeashLong-Lead-with-Padded-Foam-Handle-Metal-HookThreads-Tracking-Check-Leashes-for-Small-Medium-Large-Heavy-Duty-DogsCampingAgility-TrainingWalkingPlay-Orange-16FT
  •   Pheo-Care-Dog-Training-LeashLong-Lead-with-Padded-Foam-Handle-Metal-HookThreads-Tracking-Check-Leashes-for-Small-Medium-Large-Heavy-Duty-DogsCampingAgility-TrainingWalkingPlay-Orange-16FT

Pheo Care Dog Training Leash,Long Lead with Padded Foam Handle & Metal Hook,Threads Tracking Check Leashes for Small Medium Large Heavy Duty Dogs,Camping,Agility Training,Walking,Play (Orange, 16FT)

Share:

$18.90

🐶【Quality Material Dog Training Leash】The round climbing rope is woven from soft nylon material, it is tightly woven, not easy to pull, and has high strength, with special craftsmanship strong but lightweight, which means it’s better than normal leashes and good for a long term use. 3/8” thick rope provides maximum durability and the check cord has a comfortable padded adjustable move double-layered handle, protecting your hand from rope burn.
🐕【360° Swivel Hook Long Dog Leash】Chew proof dog leash with 360-degree rotatable hook metal rust prevention hook, easy to hook on your dog’s collar and will not break, can be moved with your dog and keeps the leash from getting tangled. Reinforced stitching design makes dog leashes safer and more durable.
🦮【Perfect Length Rope Dog Leash】The 16ft training dog leash is the perfect balance between freedom and control, the distance between human and dog can be adjusted at will, allowing your dog to explore while maintaining control. A long leash gives the dog more roaming area and freedom, making it a great choice for dog off-leash training, hiking, camping, walking. Make your pet more friendly and fun with other pets.

  Pheo-Care-Dog-Training-LeashLong-Lead-with-Padded-Foam-Handle-Metal-HookThreads-Tracking-Check-Leashes-for-Small-Medium-Large-Heavy-Duty-DogsCampingAgility-TrainingWalkingPlay-Orange-16FT Pheo Care Dog Training Leash,L...

$18.90

Questions:

(416) 346 - 3326

🐶【Quality Material Dog Training Leash】The round climbing rope is woven from soft nylon material, it is tightly woven, not easy to pull, and has high strength, with special craftsmanship strong but lightweight, because of this it’s better than normal leashes and good for a long term use. 3/8” thick rope provides maximum durability and the check cord has a comfortable padded adjustable move double-layered deal with, protecting your hand from rope burn.
🐕【360° Swivel Hook Long Dog Leash】Chew proof dog leash with 360-degree rotatable hook metal rust prevention hook, easy to hook on your dog’s collar and will not break, will also be moved with your dog and keeps the leash from getting tangled. Reinforced stitching design makes dog leashes safer and more durable.
🦮【Perfect Length Rope Dog Leash】The 16ft training dog leash is the easiest balance between freedom and keep an eye on, the distance between human and dog will also be adjusted at will, allowing your dog to explore whilst maintaining keep an eye on. A long leash gives the dog more roaming area and freedom, making it a great choice for dog off-leash training, hiking, camping, walking. Make your pet more friendly and fun with other pets.
🐕‍🦺【Waterproof Floatable Design Strong Dog Leash】The non-absorbent material doesn’t get heavier in the water, it doesn’t sink, it floats when submerged, and it stands out against any background. Pets can swim without interfering with activity. in an effort to play with your dogs at sea beach or pool. It also comes with a waterproof storage bag for easy rope storage.
🐩【 Multi-Purpose Long Leash For Dog Training】This durable, long, waterproof dog training leash is suitable for all breeds of dogs. Puppy, medium, large, heavy-duty dogs slip rope leash great for walking, hiking, swimming, camping, training, hunting, backyard, beach, recall training, and outside play. Can be used as a clothesline, lashing rope, climbing rope, luggage belt, and the like. Withstands 600 – 750 lbs of pull. Make your dog more comfortable, run freely.

Reviews

There are no reviews yet.

Be the first to review “Pheo Care Dog Training Leash,Long Lead with Padded Foam Handle & Metal Hook,Threads Tracking Check Leashes for Small Medium Large Heavy Duty Dogs,Camping,Agility Training,Walking,Play (Orange, 16FT)”

Your email address will not be published. Required fields are marked